top of page

ArcelorMittal's Ghent’sSustainable Synergy: Steam's Salvific Sustainability Saga
Luminus Solutions secured a contract to construct a 1.3 MW steam turbine at ArcelorMittal's Ghent site, converting high-pressure steam from sewage sludge incineration into green electricity & low-pressure steam. The €12 million ($12.8 million) project, financed by public investor FINEG through FINARMIT, involves design, construction, maintenance, & operation for 15 years. ArcelorMittal will use the low-pressure steam in steel production, reducing fossil fuel consumption & CO₂ emissions. The installation must be operational by end of 2026, supporting ArcelorMittal Belgium's carbon neutrality ambitions by 2050 through circular energy recovery.
bottom of page