top of page
Tata's Thermal Triumph Transforms Traditional Techniques

Tata Steel & Kraftblock completed a successful year-long thermal energy storage pilot at Jamshedpur's Sinter Plant #3. The system recovers high-temperature waste heat from sintering operations to warm process water, reducing fuel consumption significantly. The collaboration achieved 22,000 metric tons annual CO₂ emission reductions while demonstrating scalability potential across multiple steel production facilities through waste heat recovery technology.

Previous
Next
bottom of page